114.1 MW Kelmė wind farm I in Lithuania has reached the commercial operation date

AB “Ignitisgrupė” (hereinafter – the Group) informs that Kelmėwind farm I ,controlled by its subsidiary UAB “Ignitis renewables” (hereinafter – Ignitis Renewables) ,has reached the commercial operation date (hereinafter – COD) .   The projectis located in central Lithuania , Kelmė district , and consists of 16 Nordex N163/6.X wind turbines with atotalinstalled capacity of 114 ...
Comunicato Precedente

next
Comunicato Successivo

next

AB “Ignitisgrupė” (hereinafter – the Group) informs that Kelmėwind farm I,controlled by its subsidiary UABIgnitis renewables” (hereinafter – Ignitis Renewables),has reached the commercial operation date (hereinafter – COD). 

The projectis located in central Lithuania, Kelmė district, and consists of 16 Nordex N163/6.X wind turbines with atotalinstalled capacity of 114.1 MW.The total investments in the wind farm will reacharound EUR 190 million. 

The installed capacity was adjusted in accordance with the current regulations, resulting in an increase from 105.4 MW, as previously reported,to 114.1 MW. 

Kelmė wind farm I, together with Kelmė wind farm II, which is set to reach COD later this year, is a partof the largest wind project currently under construction in the Baltics, Kelmė wind farm. The project will havea combined installed capacity of 313.7 MW (up from 300 MW).The wind farm will be able to cover the electricity demand of 250 thousand Lithuanian households. The expected total investmentsin the 313.7 MW Kelmė wind farm, including the acquisition price and construction costs, should reach around EUR 550 million. 

Since the COD of Kelmėwind farmI, the Group's installed Green Capacities haveincreased to 1.5 GW (from 1.4 GW). 

The Group reminds that itsobjective is to increase its Green Capacities from 1.4 GW in 2024 to 4–5 GW by 2030. For further details, see the Group's strategy (link). 

The information provided in this announcement does not affect the Group's Adjusted EBITDA and Investments guidance for 2025.


For additionalinformation, please contact:

Communication
Valdas Lopeta
+370 62177993
[email protected] 


Per maggiori informazioni
Sito Web
le.lt

Ufficio Stampa

 Nasdaq GlobeNewswire (Leggi tutti i comunicati)
2321 Rosecrans Avenue. Suite 2200
90245 El Segundo Stati Uniti

Allegati
Slide ShowSlide Show
Non disponibili
;