Energia
Linxon secures position on National Grid EPC substations framework
"We are delighted to have been selected by National Grid to enter into a further long-term relationship and secure our place on this exciting EPC (Engineering, Procurement and Construction) substation framework. With Linxon's parentage, this award builds on many decades of collaboration and successful delivery between our organisations and I look forward to continuing this over the next 5 years with a firm focus upon achieving our shared NetZero ambitions", said Jon Downs , Managing Director of Linxon UK.
Linxon commenced operations on September 1, 2018 , undertaking turnkey electrical alternating current substation projects related to renewable and conventional power generation, power transmission and transportation solutions. Substations enable the efficient and reliable transmission and distribution of electricity. Within the substation, switchgear controls and protects the network from power outages and facilitates reliable electricity supply.
+46 70 6083017
Downs, Jonathan
This information was brought to you by Cision http://news.cision.com
https://news.cision.com/linxon/r/linxon-secures-position-on-national-grid-epc-substations-framework,c3312054
The following files are available for download:
This information was brought to you by Cision http://news.cision.com
https://news.cision.com/linxon/r/linxon-secures-position-on-national-grid-epc-substations-framework,c3312054
The following files are available for download: