Editoria e Media
Xinhua Silk Road: PJOE-constructed offshore wind turbine jackets delivered to U.K.
Distinguished from traditional turbine jacket project, this project is PJOE's first turbine jacket group project. The company started to make a jacket every 7 days. Each process such as TKY node prefabrication, horizontal assembly and SMLT lifting needed to be strictly planned and executed, so as to guarantee the overall progress of the project.
Moreover, the project adopted a European standard, EN1993, which posted strict requirements on welding, size and paint of TKY nodes. Faced with challenges, the project team strengthened quality planning and innovation. The team overcame the high temperature in summer and technical difficulties, and hit a record of zero rework for the welding of the closing mouth in the Chinese fields.
In terms of shipment, the project team actively optimized the loading plan and coordinated with relevant government units, owners, and ship owners, making sure to ship the wind turbine jackets on schedule.
PJOE, located in east China's Shandong Province , is a globally operating upstream fabricator which specializes in the fabrication of large and complex structures for the upstream industry for oil and gas, mining, desalination, energy and related activities.
Original link: https://en.imsilkroad.com/p/329709.html
Photo - https://mma.prnewswire.com/media/1886103/PJOE.jpg