Comunicati Stampa
Industria

Pumping/Production Well Installation Begins at HMN Li Project

The first well, NM-WW-01-23, located at the Natalia Maria claim block, is currently being drilled to a depth of 200m.  Early results from core drilling are promising, with a lithium concentration exceeding 1,175 milligrams per liter (as announced on April 6, 2023). The first well, NM-WW-01-23, located at the Natalia Maria claim block, is currently being drilled to a depth of200m.  Early results from core drilling are promising, with a lithium concentration exceeding 1,175 milligrams per...
VANCOUVER, BC, (informazione.news - comunicati stampa - industria)

The first well, NM-WW-01-23, located at the Natalia Maria claim block, is currently being drilled to a depth of 200m .  Early results from core drilling are promising, with a lithium concentration exceeding 1,175 milligrams per liter (as announced on April 6, 2023 ).

Following the completion of the Natalia Maria well, the team will begin drilling two wells at the Alba Sabrina block, with depths of 400m and 200m , respectively.  The Alba Sabrina claim block is the largest in the HMN Li Project claim group, encompassing 2,089 hectares of the total 3,287-hectare salar footprint.  The upgraded project resource ( September 12, 2023 ) delineates a resource of 927,500 tonnes of Lithium Carbonate Equivalent (LCE) within this block.

In addition to the above, Lithium South Development is reviewing technical data associated with the southern Viamonte and Norma Edit claim blocks.  These blocks are being evaluated for potential production well installation during this drilling campaign.

To assist in distributing the Company message, Batteryjuniors.com, an advertising and marketing company based in Sweden , have been retained to develop a advertising program world wide with special focus on the United States and Canada . Total cost for the six month program is 100,800 Euros and is expected to begin immediately.

Lithium South (LIS) owns 100% of the Hombre Muerto North Lithium Project (HMN Li Project) located in Salta and Catamarca Provinces, Argentina , the heart of the lithium triangle.  The Hombre Muerto Salar has a history of lithium production, with Livent Corporation in operation for over twenty-five years, in an area just south of the HMN Li Project.  The HMN Li Project is surrounded by a US$4 billion lithium development under construction by POSCO (Korea) and the Sal de Vida Project under development by Allkem. LIS has delineated a NI 43-101 compliant 1,583,100 tonne Lithium Carbonate Equivalent (LCE) resource on the Alba Sabrina, Natalia Maria, and Tramo, claim blocks, three of five non-contiguous blocks that make up the HMN Li Project.  LIS is now transitioning from being a lithium explorer to becoming a lithium developer. 

Mr. William Feyerabend , a Consulting Geologist and Qualified Person under NI 43-101 contributed to the production of this press release and approves of the technical and scientific information contained herein.

Adrian F. C. Hobkirk
President and Chief Executive Officer
Investors / Shareholders call 1-855-415-8100 / website: www.lithiumsouth.com

This news release contains certain "forward-looking statements" within the meaning of Section 21E of the United States Securities and Exchange Act of 1934, as amended. Except for statements of historical fact relating to the Company, certain information contained herein constitute forward-looking statements. Forward-looking statements are based upon opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors which could cause actual results to differ materially from those projected in the forward-looking statements.  The reader is cautioned not to place undue reliance on forward- looking statements.  We seek safe harbor.

View original content:https://www.prnewswire.co.uk/news-releases/pumpingproduction-well-installation-begins-at-hmn-li-project-301928108.html

Ufficio Stampa
 PR Newswire (Leggi tutti i comunicati)
209 - 215 Blackfriars Road
LONDON United Kingdom
Allegati
Non disponibili