Comunicati Stampa
Economia

114.1 MW Kelmė wind farm I in Lithuania has reached the commercial operation date

AB “Ignitisgrupė” (hereinafter – the Group) informs that Kelmėwind farm I ,controlled by its subsidiary UAB “Ignitis renewables” (hereinafter – Ignitis Renewables) ,has reached the commercial operation date (hereinafter – COD) .   The projectis located in central Lithuania , Kelmė district , and consists of 16 Nordex N163/6.X wind turbines with atotalinstalled capacity of 114 ...
Per maggiori informazioni
Sito Web
le.lt
Ufficio Stampa
 Nasdaq GlobeNewswire (Leggi tutti i comunicati)
2321 Rosecrans Avenue. Suite 2200
90245 El Segundo Stati Uniti
Allegati
Non disponibili